Dashboard Hidrologi

Select Language

Kembali ke Beranda
Job Detail

Job Detail

Job ID: 08f390ff-82e9-4642-9c7e-80d0ce52065f

Completed

Selesai!

Location Information

Location Name

Sumberejo

Coordinates

-6.778148, 111.225243

Description

Sumberejo, Pati, Jawa Tengah, Jawa, Indonesia

Analysis Period

Start Date

01 November 2025

End Date

18 January 2026

Duration

79 days

📊 ANALYSIS SUMMARY

Structured Summary

Job Information

Job ID: 08f390ff-82e9-4642-9c7e-80d0ce52065f
Status: Completed
Created: N/A
Completed: N/A
Files Generated:
7 PNG 6 CSV 7 JSON

Data Statistics

Total Analysis Days: 65 days

Rainfall

Average
7.06 mm/hari
Maximum
25.16 mm
Minimum
0.00 mm
Total
458.67 mm

Retention Pond Volume

Average
0.08 mm
Maximum
0.09 mm
Minimum
0.07 mm
End of Period
0.07 mm

System reliability

Average
2.6%
Poor - Perlu intervensi segera

Analysis Results

Output Components

Total Supply
0.00 mm
Evapotranspiration
0.00 mm
Runoff
0.00 mm
Total Output
0.00 mm

Input Components

Rainfall
0.00 mm
River Inflow
0.00 mm
Groundwater
0.00 mm
Total Input
0.00 mm

River Morphology

River Width
25.18 m
Normal
Slope
N/A
Sediment Load
0.36 ton/hari
Normal

Soil Storage Condition

Soil Moisture
0.30 mm
Kering
Infiltration
0.19 mm/hari
Low
Percolation
0.01 mm/hari
To groundwater: 0.41 mm (estimasi 70%)

Water Balance

Total Input
458.67 mm
Rainfall
Total Output
473.96 mm
ET + Runoff + ΔS
Residual
0.00 mm
Error
0.00%
Balance Status
Excellent - Error minimal

Kualitas Data

Data Completeness 100%
Valid Period ✅ Yes

Available Files:

Visualization
7 file PNG
CSV Data
6 file CSV
Metadata
7 file JSON

Management Recommendations (3)

1 System Reliability
High

Tingkatkan reliability sistem dengan meningkatkan capacity Retention Pond atau menambah sumber air alternatif

2 Supply Air
High

Segera lakukan konservasi air dan cari sumber air tambahan untuk mengatasi defisit

3 Mitigasi Banjir
High

Persiapkan sistem early warning dan infrastruktur untuk menghadapi risiko banjir high

WATER DISTRIBUTION & PRIORITY

Domestic
Legal Quota: 0.4 mm/hari
Allocation: 0.01 mm/hari
Priority: 10 (Highest)
Fulfillment: 2.2%
Agriculture
Legal Quota: 0.8 mm/hari
Allocation: 0.01 mm/hari
Priority: 7
Fulfillment: 1.4%
Industry
Legal Quota: 0.2 mm/hari
Allocation: 0.01 mm/hari
Priority: 5
Fulfillment: 5.8%
Environmental
Legal Quota: 0.3 mm/hari
Allocation: 0.01 mm/hari
Priority: 9
Fulfillment: 4.0%

WATER SOURCES

River
Supply: 0.03 mm/hari
Cost: Rp 150/m³
Contribution: 60%
Diversion
Supply: 0.01 mm/hari
Cost: Rp 200/m³
Contribution: 25%
Air Soil
Supply: 0.01 mm/hari
Cost: Rp 350/m³
Contribution: 15%

COST & BENEFIT

Total Cost
Rp 572
Total Benefit
Rp 1,723
Net Benefit
Rp 1,151
Efficiency
301.2%
Breakdown Cost:
Biaya Operasi: Rp 424
Biaya Pemeliharaan: Rp 64
Biaya Energi: Rp 85
Manfaat Agriculture: Rp 371
Manfaat Domestic: Rp 448
Manfaat Industry: Rp 905

WATER QUALITY

WQI (Water Quality Index)
57.7/100
Fair
pH Level
7.25
DO (Dissolved Oxygen)
6.56 mg/L
TDS (Total Dissolved Solids)
148.53 mg/L

RIVER & ENVIRONMENT CONDITION

River Morphology
Lebar Sungai: 25.18 m
Kemiringan: N/A
Beban Sediment: 0.36 ton/hari
Erosion Rata Rata: 29.14 mm/tahun

📊 SYSTEM CONDITIONS SUMMARY

Water Availability Condition
2.6%
Status: Poor - Perlu intervensi segera
Retention Pond Volume
0.07 mm
Max: 0.09 mm
Average Rainfall
7.06 mm/hari

🌊 Analisis Risiko Banjir & Genangan Air

Apa itu TWI? Topographic Wetness Index (TWI) adalah indeks yang mengukur seberapa mudah air berkumpul di suatu lokasi berdasarkan topografi/kontur tanah. Semakin tinggi nilai TWI, semakin besar kemungkinan area tersebut tergenang air atau banjir saat hujan.

Status Risiko Lokasi Anda
📊 Indeks Kelembaban Wilayah (TWI)
19.75
Hasil Analisis: Nilai TWI 16.05 ditingkatkan 1.23x oleh Machine Learning untuk akurasi lebih baik
🚨 Tingkat Risiko Banjir
SANGAT TINGGI
Artinya: Area dengan risiko genangan tinggi
🚨 Titik Rawan Banjir yang Terdeteksi

Sistem Machine Learning kami menemukan 3 zona yang berpotensi mengalami genangan air atau banjir saat hujan lebat.

3
⚠️ Risiko Tinggi
Prioritas Utama
0
⚡ Risiko Sedang
Perlu Monitoring
0
💧 Risiko Rendah
Waspada Saja
📍 Detail Lokasi Zona Banjir:
Zona 1 ⚠️ PRIORITAS
Indeks TWI: 19.7
Luas Area: 2.50 ha
Koordinat: -6.77815, 111.22524
Zona 2 ⚠️ PRIORITAS
Indeks TWI: 19.7
Luas Area: 3.30 ha
Koordinat: -6.77315, 111.23024
Zona 3 ⚠️ PRIORITAS
Indeks TWI: 19.7
Luas Area: 4.10 ha
Koordinat: -6.78315, 111.22824
🌳 Rekomendasi Ruang Terbuka Hijau (RTH)

Untuk mengurangi risiko banjir, sistem Machine Learning merekomendasikan pembuatan 1 lokasi RTH seperti taman, hutan kota, atau area resapan air.

0
🔥 Prioritas Tinggi
Segera Dibangun
0
⭐ Prioritas Sedang
Rencana Jangka Menengah
3.9
📏 Total Luas
Hektar (ha)
📍 Lokasi yang Direkomendasikan:
Lokasi RTH 1 ⭐ RENCANA
Luas Estimasi: 3.90 ha
Koordinat: -6.77015, 111.21924
💡 Alasan:

Intercept upstream runoff before reaching flood zones

🚰 Rekomendasi Sistem Drainase

Untuk mengendalikan aliran air dan mencegah genangan, sistem merekomendasikan pembangunan 4 saluran drainase di lokasi-lokasi strategis.

4
🔥 Prioritas Tinggi
Segera Dibangun
0
⭐ Prioritas Sedang
Rencana Jangka Menengah
108,488
⚡ Kapasitas Total
m³/jam
📍 Detail Lokasi Drainase:
DRAIN_001 🔥 URGENT
Tipe: Primary Drainage Channel
📍 Koordinat: -6.77215, 111.22924
⚡ Kapasitas: 27,122 m³/jam
🔧 Spesifikasi Teknis:
Lebar: 2.5 m
Kedalaman: 1.5 m
Kemiringan: 0.82%
Material: Concrete
✨ Manfaat yang Diharapkan:
🛡️ Pengurangan banjir: 35.769207593356%
⏱️ Pengurangan waktu genangan: 7.6 jam
📏 Area terlindungi: 31 ha
🔧 Kebutuhan Perawatan:
🧹 Pembersihan: Monthly
🔍 Inspeksi: Weekly during rainy season
💰 Biaya tahunan: Rp 7.500.000
💡 Alasan Pembangunan:
  • High TWI (19.7) indicates severe water accumulation
  • Multiple flood zones (3) require comprehensive drainage
  • Strategic placement for optimal flood mitigation
DRAIN_002 🔥 URGENT
Tipe: Secondary Drainage Network
📍 Koordinat: -6.78315, 111.23124
⚡ Kapasitas: 27,122 m³/jam
🔧 Spesifikasi Teknis:
Lebar: 2.5 m
Kedalaman: 1.5 m
Kemiringan: 0.82%
Material: Concrete
✨ Manfaat yang Diharapkan:
🛡️ Pengurangan banjir: 35.769207593356%
⏱️ Pengurangan waktu genangan: 7.6 jam
📏 Area terlindungi: 31 ha
🔧 Kebutuhan Perawatan:
🧹 Pembersihan: Monthly
🔍 Inspeksi: Weekly during rainy season
💰 Biaya tahunan: Rp 7.500.000
💡 Alasan Pembangunan:
  • High TWI (19.7) indicates severe water accumulation
  • Multiple flood zones (3) require comprehensive drainage
  • Strategic placement for optimal flood mitigation
DRAIN_003 🔥 URGENT
Tipe: Lateral Collection System
📍 Koordinat: -6.77115, 111.22024
⚡ Kapasitas: 27,122 m³/jam
🔧 Spesifikasi Teknis:
Lebar: 2.5 m
Kedalaman: 1.5 m
Kemiringan: 0.82%
Material: Concrete
✨ Manfaat yang Diharapkan:
🛡️ Pengurangan banjir: 35.769207593356%
⏱️ Pengurangan waktu genangan: 7.6 jam
📏 Area terlindungi: 31 ha
🔧 Kebutuhan Perawatan:
🧹 Pembersihan: Monthly
🔍 Inspeksi: Weekly during rainy season
💰 Biaya tahunan: Rp 7.500.000
💡 Alasan Pembangunan:
  • High TWI (19.7) indicates severe water accumulation
  • Multiple flood zones (3) require comprehensive drainage
  • Strategic placement for optimal flood mitigation
DRAIN_004 🔥 URGENT
Tipe: Outlet Channel
📍 Koordinat: -6.78415, 111.22124
⚡ Kapasitas: 27,122 m³/jam
🔧 Spesifikasi Teknis:
Lebar: 2.5 m
Kedalaman: 1.5 m
Kemiringan: 0.82%
Material: Concrete
✨ Manfaat yang Diharapkan:
🛡️ Pengurangan banjir: 35.769207593356%
⏱️ Pengurangan waktu genangan: 7.6 jam
📏 Area terlindungi: 31 ha
🔧 Kebutuhan Perawatan:
🧹 Pembersihan: Monthly
🔍 Inspeksi: Weekly during rainy season
💰 Biaya tahunan: Rp 7.500.000
💡 Alasan Pembangunan:
  • High TWI (19.7) indicates severe water accumulation
  • Multiple flood zones (3) require comprehensive drainage
  • Strategic placement for optimal flood mitigation
⚡ Tindakan yang Perlu Dilakukan:

Perlu mitigasi banjir dan RTH

📋 Rekomendasi Prioritas:
  1. Prioritas Utama: Segera tinjau dan beri perhatian khusus pada 3 zona risiko tinggi yang terdeteksi
  2. Pembangunan Drainase: Bangun 4 saluran drainase prioritas tinggi untuk mengalirkan air hujan
  3. Perencanaan Jangka Menengah: Rencanakan 1 lokasi RTH tambahan dalam 1-2 tahun ke depan
  4. Monitoring Berkala: Lakukan pemantauan rutin saat musim hujan untuk antisipasi dini
  5. Koordinasi: Libatkan Dinas Pekerjaan Umum dan masyarakat dalam implementasi solusi

📅 30-Day Forecast

Rainfall
Rata-rata: 14.34 mm/hari
Minimum: 14.34 mm
Maximum: 14.34 mm
Total: 931.95 mm
Retention Pond
Kondisi Saat Ini: 0.07 mm
Prediksi 30 Hari: 0.07 mm
Persentase Kapasitas: 0.1%
Reliability
Saat Ini: 2.6%
Prediksi 30 Hari: 3.9%
Tren: Stable

⚠️ Potensi HUJAN TINGGI. Siapkan mitigasi banjir, pastikan drainase optimal.

📋 Management Suggestions

1. 🔴 PRIORITAS TINGGI: Retention Pond kritis (<20mm). Terapkan rationing air segera.

2. 🔴 Keandalan sistem <70%. Audit infrastruktur, kurangi kebocoran.

🔧 Improvement Suggestions & Action Plan

Konservasi Air Soil
Medium Priority

Problem: Humidity soil_storage low (0.30 mm)

Solution:
  • Buat sumur resapan untuk meningkatkan infiltration
  • Implementasi rainwater harvesting
  • Terapkan mulching untuk mengurangi evaporasi
Cost: Rp 100-300 juta
Timeline: 2-4 bulan
Kapasitas Retention Pond
HIGH PRIORITY

Problem: Kapasitas Retention Pond kritis (0.08 mm)

Solution:
  • Evaluasi capacity Retention Pond, pertimbangkan peningkatan/penambahan
  • Optimalkan sistem distribusi untuk reduce losses
  • Implementasi demand management (rationing, pricing)
  • Explore alternative water sources (groundwater, recycled water)
Cost: Rp 5-20 miliar (upgrading infrastruktur)
Timeline: 12-24 bulan
Flood
HIGH PRIORITY

Problem: Risiko banjir high (78.4%)

Solution:
  • Bangun/perbaiki sistem drainase dan kanal banjir
  • Buat detention pond/kolam retensi
  • Tingkatkan capacity spillway
  • Implementasi early warning system
Cost: Rp 1-5 miliar
Timeline: 6-12 bulan
Infrastructure Reliability
Medium Priority

Problem: Keandalan sistem low (2.6%)

Solution:
  • Audit menyeluruh infrastruktur distribusi
  • Perbaiki kebocoran pipa (leak detection & repair)
  • Upgrade pompa dan valve yang sudah tua
  • Implementasi SCADA system untuk monitoring real-time
Cost: Rp 500 juta - 3 miliar
Timeline: 6-9 bulan

🌊 Interactive River Map NEW

River network visualization with Google Earth Engine data

Memuat peta interaktif...

Mohon tunggu sebentar

Peta interaktif dengan marker & buffer. Zoom/pan dengan mouse. Toggle layer di kanan atas.

Lokasi Analisis

Sumberejo

-6.7781, 111.2252

Layer Peta

4 Data Sources

HydroSHEDS, JRC GSW, SRTM, OSM

Area Buffer

10 km radius

Area analisis jaringan sungai

File yang Dihasilkan

Total 21 file

RIVANA_Peta_Aliran_Sungai.html

HTML 0.01 MB

Dashboard Utama RIVANA

Dashboard utama menampilkan hasil analisis hidrologi dengan Machine Learning

PNG 0.56 MB

Dashboard Lengkap RIVANA

Dashboard lengkap dengan prediksi, analisis risiko, dan rekomendasi

PNG 0.92 MB

RIVANA_TWI_Dashboard.png

PNG 0.60 MB

Dashboard Keseimbangan Air

Visualisasi keseimbangan air: input vs output, komponen hidrologi

PNG 0.72 MB

Ringkasan Morfometri

Parameter morfometri DAS: luas, bentuk, kemiringan, drainase

PNG 0.28 MB

Dashboard Morfologi & Ekologi

Kondisi geomorfologi sungai dan kesehatan ekosistem akuatik

PNG 0.89 MB

Perbandingan ML vs Traditional

Perbandingan akurasi model Machine Learning vs metode tradisional

PNG 0.57 MB

Data Lengkap Hasil Simulasi

Data time series lengkap: curah hujan, temperature, ET, debit, level waduk, supply-demand

CSV 0.08 MB

Keseimbangan Air Bulanan

Ringkasan bulanan: presipitasi, evapotranspirasi, infiltrasi, runoff, storage

CSV 0.00 MB

Prediksi 30 Hari ke Depan

Forecast curah hujan dan level waduk 30 hari ke depan dari model ML

CSV 0.00 MB

GEE_Raw_Data.csv

CSV 0.01 MB

RIVANA_WaterBalance_Indices.csv

CSV 0.01 MB

RIVANA_Hasil_Simulasi.csv

CSV 0.08 MB

Validasi Model Lengkap

Metrik validasi model: NSE, R², PBIAS, RMSE untuk semua parameter

JSON 0.01 MB

RIVANA_Baseline_Comparison.json

JSON 0.00 MB

RIVANA_TWI_Analysis.json

JSON 0.01 MB

Validasi Keseimbangan Air

Validasi keseimbangan air dengan error maksimal 5%

JSON 0.00 MB

RIVANA_Model_Validation_Report.json

JSON 0.00 MB

GEE_Data_Metadata.json

JSON 0.00 MB

RIVANA_Metadata_Peta.json

JSON 0.00 MB

Timeline

Dibuat

18 Jan 2026, 00:03

Dikirim

18 Jan 2026, 00:03

Mulai Diproses

18 Jan 2026, 00:03

Selesai

18 Jan 2026, 00:05

Statistik

File PNG
7
File CSV
6
File JSON
8
Total File
21